Lifter installation steps
Step # 1
Move the up side baskets to the last roof of the work and place the basket in front of the building with a longitudinal distance and so that the tip of the profile, which has three holes, is located 50 cm outside the support.
Step # 6
Tie the weight of the parachute with a clamp to the tow wire that hangs from the parachute (this wire should always be attached to the weight so that it does not collapse because this wire is for the safety of the device and in case of a problem for the dead wire, this wire is unlocked automatically. Acts and prevents accidents)
Step # 2
Put 300 kg of weight in each basket
Step # 7
Close the handlebars in front of the basket, which has a sliding space, to maintain the distance between the basket and the wall.
Step # 3
Hang the tow ropes from the front screws of the profile.
Step # 8
Connect the climbers to the control box
Step # 4
Close the gearboxes to the front view bask
Step # 9
Connect the control box to 380 V power (it is better to hang the power cable from the last ceiling for safety and caution)
Step # 5
Pass the tow ropes through the parachute and the gearbox itself
Step # 10
Using the control box buttons, you can easily move the Basket up and down